Installation manual

Rinnai New Zealand Limited Neo Installation Manual: 11906-B
02-11
24
Checking the ame paern
It may take approximately two hours of operation for the logs to achieve their full ame
pattern and glow. During the initial burning in period, some smoke and smell may be
experienced. The appliance should be run on the high setting in a well ventilated room until
these dissipate. It is important to check the ame pattern during this time.
Abnormal ame paern
Abnormal ame performance and/or pattern can indicate a problem with the re, such as
blocked gas injectors, log movement during installation or incorrect ue installation. There are
some warning signs that could indicate a problem.
Unusual smell from the appliance
Continued diculty or delay in establishing a ame
Flame appears either very short or very long
Flame only burns part way across the burner
Severe soot building up on the inside of the glass door
Normal flame paern
Abnormal flame paern
Soot build up
It is the responsibility of the installer to check that under normal conditions of the
appliance, all ue gases are exhausted to the outside atmosphere and that there are no
spillage of combustion gases into the room.
If the appliance cannot be made to perform correctly, please contact Rinnai.