Installation manual

Rinnai New Zealand Limited Neo Installation Manual: 11906-B
02-11
3
Checklist
Engine - masonry installation:
1. Rinnai Neo heater (engine)
2. Outer (attached to heater with 2 x 8 g black screws)
3. Glass outer dress guard
4. Inner frame
5. Log set (inside appliance)
6. Packet of burner granules
7. Semi rigid stainless steel gas pipe with 5/8 " UNF are connection
8. Flared brass adaptor 5/8 " UNF - ½ " BSPT
9. Foam sealing strip
10. Operation and installation manual
7
8
6
5
9
2
3
1
4
5
10
Inbuilt mock chimney installation:
A Engine set (see above)
1. Spigot adaptor
2. Spigot guide panel
3. Spigot guide rails
4. Zero clearance box top panel
5. Zero clearance box rear panel
6. Zero clearance box left and right panels
7. Zero clearance box base panel
8. Hardware pack
A
3
7
2
1
8
5
6
4
Freestanding console installation:
A Engine set (refer masonry installation)
1. Spigot adaptor
2. Console top panel
3. Console right side panel
4. Console left side panel
5. Console rear panel
6. Console pillar
7. Hardware pack
1
A
3
2
7
4
5
6
Freestanding plinth installation:
A Engine set (refer masonry installation)
1. Spigot adaptor
2. Plinth top panel
3. Plinth right side panel
4. Plinth left side panel
5. Plinth rear panel
6. Plinth pillar
7. Plinth base
8. Hardware pack
1
A
3
2
4
5
6
7
8
Remote/thermostat - comes with all ETR models
1. RF combination remote/thermostatic control with wall mount
2. AA batteries (x2)
3. Operation manual
1
2
3