6.7.3 Installationoftheventsystem
Consult local and state codes pertaining to special building code and re
departmentrequirements.Adheretonationalcoderequirements.
Follow the listed maximum length of vent systems, which are boiler output
dependent.Themaximumpermissiblelengthsarelistedintable9,chapter6.7.7.
Decide how to install the exhaust and air intake system. You can choose among:
- Concentricsystem
The concentric connection is provided standard initially.
The boiler concentric connection diameter is 3"/5" (80/125 mm), to which the venting
and air supply system can be tted, with or without elbow pieces. The maximum
permissible pipe length is displayed in table 9, chapter 6.7.7.
- Parallelsystem
The boiler can be converted to a parallel system with supplied adapters.
It is possible to use a parallel pipe connection of 2x 3". In this case a separate supplied
kit, with 2 vent adapters 3" (ø80mm), cover 5" (ø125mm), vent exhaust pipe and
gaskets should be tted instead of the concentric vent adapter on top of the boiler.
See chapter 6.7.3.1 for installation. The maximum permissible pipe length is set out
in table 9, chapter 6.7.7.
-RoomAirSystem(indoorcombustionair)
The boiler can use room air for combustion. If this option is selected the boiler must
rst be converted to the parallel system. A single exhaust pipe can then be tted.
It is required to use a room air lter (Part nr. 808000025) when using indoor air for
combustion. See chapter 6.7.3.2 for installation. The maximum permissible pipe
length is set out in table 9, chapter 6.7.7.
RinnaistronglyrecommendstheuseoftheroomairlterincaseofRoomAir
System(indoorcombustionair).
Whentheboiler is installedinanyoftheareaslisted in chapter 5.1,"Areas
likelytohavecontaminants"oranyareaexposedtothecontaminantslistedin
chapter5.1,thensealedcombustionisrequired.
Weadvisetoinstallaventsystemoutoftheventingsystemprogramsuppliedby
Rinnai(Seechapter19PartslistVentsystem).Forfurtherinformationaboutthe
availablecomponentsoftheventingandairsupplysystemwerecommendyou
consultRinnaiandtheInstallationinstructionsandpartslistdocumentation.