User manual
Installation & Servicing Instructions Rinnai Q-Series
51
10 Startingup:Fillingandde-aeratingtheboilerandinstallation
CAUTION
Observe the following rules of safety:
- All work on the unit must take place in a dry environment.
- Rinnai units may never be in operation without their housing, except in connection
with maintenance or adjustments (see Chapter 13 and 14).
- Never allow electrical or electronic components to come into contact with water.
NOTICE
Carry out the following tasks in connection with maintenance, etc. to an already-
installed unit:
- Shut down all programs
- Close the gas shut off valve
- Shut off the power at the main power switch
- Close the service valves (supply and return)
NOTICE
Take note of the following when maintenance or adjustments are needed:
- The unit must be able to function during these activities; for this reason, the unit’s
supply voltage, gas pressure and water pressure must be maintained. Ensure that
this is not a source of potential danger during these activities.
Followingmaintenanceorotheractivities;alwayschecktheinstallationofall
partsthroughwhichgasows(withbubbletestusingleak-searchspray).
10.1Requirementsofthewatersystem
Before lling the heating system, the complete system, including all zones, must be
thoroughly cleaned and ushed to remove sediment. Flush until clean water runs
free of sediment. Rinnai suggests using an approved system cleaner to ush the
system, but not the boiler. Always use Rinnai approved antifreezes. See the list at
the end of this chapter. Never use reverse osmosis, D.I., or distilled water for lling
the heating system.
Do not use petroleum-based cleaning or sealing compounds in the boiler
system. Damage of seals and gaskets in boiler and system could occur,
resultinginsubstantialpropertydamage.
The central heating installation needs to be lled with potable water.
Useonlypotablewaterorapprovedglycolforllingtheheatingsystem.
Whenthewaterhardnessofthellingwaterexceeds>10.5gpg(200mg/L)and
thevolumeoftheinstallation>20L/kW(5.2gallons/3,412BTU)thewaterhasto
betreateduntilbelowthemaximumvalueof10.5gpg(200mg/L).
ThepHvalueoftheinstallationwatermustbebetween6.5and8.5.
Check the pH value using proper equipment or by having the water analyzed by a
water treatment company.
If pH differs from above, contact Rinnai engineering for further assistance.
Failuretoadheretothewaterqualityrequirementswillvoidthewarranty.
!
CAUTION
NOTICE
i
NOTICE
i
!
WARNING
!
WARNING
!
WARNING
NOTICE
i