13.5Installingthecasing
- Install the airbox and close all snap locks. See gure 34;
- Install the metal casing on the boiler;
- lock the casing by using the screw behind the door. See gure 35.
14 Maintenance
Maintenanceorchangestotheboilermayonlybecarriedoutbyaqualied
technician.
14.1Periodicexaminationofventingsystemsandboiler
The inspection of the boiler and venting system should be done every 2 years or
2000 hours and full maintenance every 4 years or 4000 hours of operation, whichever
occurs rst. When doing this the circumstances of the boiler’s location must be taken
into account. From this one can determine whether to deviate from this advice.
Please contact Rinnai for further guidance on the frequency and service
requirements.Contactdetailscanbefoundonthebackpageofthismanual.
14.2Inspection
Preparing the boiler for inspection
To carry out the inspection and maintenance activities please follow the next procedure:
- Switch off the power supply;
- Shut off the gas;
- Remove the screw behind the door on the front of the casing (gure 36);
- Lift the casing and remove it towards the front;
- Valve off the boiler from the system using the boiler isolation valves in the plumbing
kit.