13.5Installingthecasing
- Install the airbox and close all snap locks. See gure 34;
- Install the metal casing on the boiler;
- lock the casing by using the screw behind the door. See gure 35.
14 Maintenance
Maintenanceorchangestotheboilermayonlybecarriedoutbyaqualied
technician.
14.1Periodicexaminationofventingsystemsandboiler
The inspection of the boiler and venting system should be done every 2 years or
2000 hours and full maintenance every 4 years or 4000 hours of operation, whichever
occurs rst. When doing this the circumstances of the boiler’s location must be taken
into account. From this one can determine whether to deviate from this advice.
Please contact Rinnai for further guidance on the frequency and service
requirements.Contactdetailscanbefoundonthebackpageofthismanual.
14.2Inspection
Preparing the boiler for inspection
To carry out the inspection and maintenance activities please follow the next procedure:
- Switch off the power supply;
- Shut off the gas;
- Remove the screw behind the door on the front of the casing (gure 36);
- Lift the casing and remove it towards the front;
- Valve off the boiler from the system using the boiler isolation valves in the plumbing
kit.