Installation manual
Rinnai 13 RF1800 OIM
Flue Components
A. RFPIPE150
900mm twin skin ue pipe -
ø 150mm inner / ø 200mm outer
(approx 855mm when installed)
B. RF1800YPIECE
1. Y piece collector box (1x) -
2x ø 150mm inner / ø 200mm outer to
1x ø 200mm inner / ø 250mm outer.
2. 45° twin skin bends (2x) -
ø 150mm inner / ø 200mm outer.
3. 150mm ue pipe (2x) -
ø 150mm.
4. 200mm ue pipe over-wraps (2x) -
ø 200mm.
(height approx 615mm when installed)
C. RFPIPE200
900mm twin skin ue pipe -
ø 250mm inner / ø 300mm outer
(approx 855mm when installed)
D. RFCOWL200
Connection ø 200mm, Outer ø 350mm
E. RFBEND150
2x 45° twin skin bends -
ø 150mm inner / ø 200mm outer
(height approx 322mm when installed)
F. RFBEND200
2x 45° twin skin bends -
ø 200mm inner / ø 250mm outer
(height approx 357mm when installed)
G. RFCOWL150
Connection ø 150mm, Outer ø 300mm
Y Piece Collector Box Assembly
1. Fit the RFPIPE150 ue pipes (A) onto the engine using rivets and sealant as required.
2. Fit the ø 150mm inner 45° bends (B2) but do not x in place yet.
3. Fit the ø 200mm outer 45° bends (B2) and leave loose.
4. Fit the two 150mm ø 460mm lengths of ue pipe (B3) to the ø 150mm inner connections of the Y piece
collector box (B1), then t and square up with the assembly from above. Then x all but the ø 200mm outer
45° bends (B2) in place.
5. Fit the two 200mm over-wraps (B4) over the ø 200mm outer 45° bends (B2) and the ø 200mm outer
connections of the Y piece collector box (B1) and x all in place.
6. Complete the ue to the termination point using RFPIPE200 (C) and RFCOWL200 (D) as required.
IMPORTANT
The minimum total ue height is 2.4 metres, providing the ue is direct without offsets.
Offsets can be used on ues over 3.6 metres in height.
B4
B3
C
B4
B3
B2
A
B2
B1
D
G
E
A
F
A
C