Installation manual

Rinnai 15 RF1800 OIM
Fully Open
Corner
Refer to
note on
top fixing
Flue is shown with optional flue
gather and 200~250mm top flue
section. Alternative is to run two
flues through to termination
There must be a clear
path for the flue to pass
Platform
recommended
Allow at least
20mm gap for
power and gas
over
M
i
n
2
5
0
minimum
recommended
1000
1
0
0
0
cladding
M
i
n
7
1
5
over
Min
Min463
M
i
n
2
1
8
3
cladding
468
322 Min
26
3
M
i
n
Wall lining above the top trim must be
non-combustible for at least 300mm (wall lining
can only be fitted after firebox is installed)
There must be a clear
path for the flue to pass
Refer to
note on
top fixing
Flue is shown with optional flue
gather and 200~250mm top flue
section. Alternative is to run two
flues throught to termination
Platform
recommended
Allow at least
20mm gap for
power and gas
These sections must be fully
supported from above and
not place any load on the fire
M
i
n
463
2
5
0
Minimum
Recommended
1000
min over
295
cladding
1
0
0
0
7
1
5
M
i
n
Min
4
6
8
o
ve
r
cl
a
d
d
i
n
g
2
1
8
3
M
i
n
Wall lining above the top trim must be
non-combustible for at least 300mm (wall lining
can only be fitted after firebox is installed)