APPLIANCE GAS CONNECTION & COMMISSIONING
CAUTION
ISOLATE THE POWER AND GAS SUPPLIES BEFORE COMMENCING WORK ON THE APPLIANCE.
Once the engine has been installed and xed to the building the gas and electricity can be connected, however
some installers elect to leave this until the decorating has been completed before nalising the installation.
CAUTION
If commissioning is to be carried out after the decorating is completed, then leave the protective
plastic coverings in place and cover the front of the engine with cardboard and low-tack tape to
prevent plaster dust and debris from entering and damaging the appliance.
Refer to the diagram below for part identication.
Preparation
1. To gain access to the burner, power, and gas connections, rstly rotate the Reector Retainer upwards to
release the top of the End Reector and remove this reector.
2. Remove the Burner Cover by carefully lifting straight up.
3. Slide the Front Reector towards the gas control so as to be able to gain purchase on both ends of the
reector and remove it.
4. Remove the 2 screws holding the burner in place and slide the burner assembly forward to gain access to
the Rear Reector, slide the Rear Reector towards the gas control so as to be able to gain purchase on both
ends of the reector and remove it.
5. Push the burner assembly as far back as possible without crushing the gas supply hose or wires etc.
Burner
Pressure
Test Point
Inlet Pressure
Test Point
Injector
Sparker and
Flame Rod
Assembly
Pressure
Adjustment
Gas Inlet
Power
Connection
Reflector
Retainer
End
Reflector
Rear Reflector
Burner Fixing
Screws
Power
Plug
Earth Terminal
Spring Washer
and Nut
Power Connection Detail
Burner Cover
Front Reflector