Installation manual

Rinnai 2 RF1800 OIM
BEFORE YOU START
INSTALLATION REQUIREMENTS
This appliance MUST BE installed by an authorised person.
The installation MUST conform to local regulations.
The installation MUST also comply with the instructions supplied by Rinnai.
Service and removal MUST BE carried out by an authorised person.
CERTIFICATION
The Rinnai RF1800 has been certied by the Australian Gas Association.
The Certication Number is shown on the appliance dataplate.
No parts or functions are to be modied or permanently removed from the heater.
Please keep these instructions in a safe place for future reference.
CARTON CONTENTS
The main RF1800 engine components are supplied in a crate, components for additional installation methods are
packed separately. The following table lists the contents for each component package, ensure that the components
listed for the installation method being installed are present before proceeding with the installation.
Item Description
Contents
A B C
1
Rinnai RF1800 gas re engine
2
Gas connection kit: 200mm 3/8 Flexi tube with plug and 3/8” - 1/2” reducing are connector
3
Burner end cap
4
This Operation and Installation Manual
5
Rear reector option for corner or fully recessed installation
6
Instructions for reector panel installation
7
Rivet pack
8
End reector option for through wall or fully recessed installation
9
Instructions for reector panel installation
10
Rivet pack
2
1
3
4
A B
C
7
6
5
10
8
9