INSTALLATION MANUAL Power Flued Flamefire Space Heater Co-axial Flue System To Suit Power Flued Flamefire Models: RHFE-750ETR - ASPIRATION RHFE-752ETR RHFE-950ETR • Manufacturer’s Installation Instructions • Current AS/NZS 5601 AS/NZS 3000 • Local Regulations and Municipal Building Codes including local OH&S requirements This appliance must be installed, maintained and removed by an Authorised Person.
TABLE OF CONTENTS CONVENTIONS USED IN THIS MANUAL . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 REGULATIONS, CLEARANCES & GENERAL INFORMATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 FLUE TRANSITION CONNECTIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 LOCATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
CONVENTIONS USED IN THIS MANUAL The following symbols are used to highlight specific requirements during installation steps. CLEARANCES Where required clearances will be provided and must be observed. FALL Ensure that the specified 2° fall is maintained to either the terminal or condensate trap. MEASURE Required measurements will be provided and MUST BE observed for correct installation. CUT Cut as required to the specified measurements. FINISH Ensure that burrs and swarf are removed from all cut ends.
REGULATIONS, CLEARANCES & GENERAL INFORMATION The heater and the flue system shall be installed in accordance with the following: • The requirements of the current version of AS/NZS 5601 (Gas Installations) Note that AS/NZS 5601 is referred to in this instruction and was current at the time of printing, but may have since been superseded. It is the Installer’s responsibility to ensure that requirements of the current version of AS/NZS 5601 are met. • Manufacturers installation instructions.
REGULATIONS, CLEARANCES & GENERAL INFORMATION FLUE TRANSITION CONNECTIONS 5 4 3 2 3 2 1 1 4 5 Flue exhaust connection to heater. 2 Combustion air inlet connection to heater (Left hand ~ Large connection for model RHFE750ETR / RHFE752ETR & RHFE950ETR heaters only the Right hand ~ Small connection not used). 3 Rubber combustion air inlet cap (when supplied) is designed to fit both the large and small combustion air inlet and MUST cover the air inlet not in use. 4 Combustion air inlet.
INSTALLATION CONFIGURATIONS The following configurations are currently available. For alternative configurations contact Rinnai.
INSTALLATION CONFIGURATIONS • DIRECT When cutting the flue transition for joining to other components the minimum total length is not to be less than 300mm! DIRECT NOTE INTERNAL WALL UNDER FLOOR • DIRECT EXTENDED • EXTERNAL WALL • INTERNAL WALL • DIRECT EXTENDED • UNDER FLOOR • SIDEWAYS When cutting the flue transition for joining to other components the minimum total length is not to be less than 300mm! EXTERNAL WALL DIRECT EXTENDED NOTE SIDEWAYS Total flue length may be up to 6.
WALL PENETRATIONS It is critical that any wall penetrations are located correctly. CAUTION The enclosure dimensions specified are critical to the successful installation of this appliance and MUST BE strictly adhered to. Ensure there are no wall studs, noggins, wiring or other obstruction within the wall cavity where the flue is proposed to penetrate. Ensure the location of the flue terminal can comply with the requirements of AS/NZS 5601. Figure 6.
FLUE COMPONENTS ASPDFK (Direct Flue Kit 750/752, 950) ASPKIT03 (Flue Adaption Kit 750/752, 950) Internal Wall Plate Condensation Trap External Wall Plate Drain Tube Flue Terminal Flue Transition Silicon Grease Wall Clip 22mm x6 7mm x2 Flue Transition Mounting/Securing Screws Silicon Grease ESBEND Pipe Locating Spacer x2 (second spacer supplied to assist centreing of extended offset installations) ESCONDK (Condensate Trap Kit) Co-Ax Pipe Bends x2 ESPIPE900 ESPLATE External Wall Plate Drain Tube
FLUE COMPONENT ASSEMBLY CREATING A “DIRECT” FLUE INSTALLATION e Activities for creating a Direct flue installation: a. Create Wall Penetration. c b. f d a b Locate Heater. c. Connect Heater Exhaust. d. Connect Combustion Air Hose. e. Cut Components (As Required). f. Assemble Wall Terminal. z. Finalise Installation & Commissioning Of Heater.
FLUE COMPONENT ASSEMBLY CREATING A “DIRECT EXTENDED” FLUE INSTALLATION Activities for creating a Direct Extended flue installation: a. Create Wall Penetration. e c b. d f b a Locate Heater. c. Connect Heater Exhaust. d. Connect Combustion Air Hose. e. Cut, Fit & Secure Components (As Required). f. Assemble Wall Terminal. z. Finalise Installation & Commissioning of Heater. CAUTION CAUTION CAUTION Total flue length can be up to 6.5 metres with 2 bends or 8.5 metres with zero bends.
FLUE COMPONENT ASSEMBLY CREATING AN “EXTERNAL WALL” FLUE INSTALLATION Activities for creating an External Wall installation: a.- f. Refer to steps a. - f. of Creating Direct / Creating Direct Extended Flue Installations (As Required). Total flue length can be up to 6.5 metres long and can contain a maximum of two (2) ESBEND (2 x 90°)! j l i g Assemble Wall Plate. h. Assemble & Fit Bend. i. Fit Condensate Drain. j. Cut, Fit & Secure Components. Seal Joints (As Required). h k g.
FLUE COMPONENT ASSEMBLY Min’ required protrusion 50mm ! Ex te 4 ! 22mm x 3 ! rio rw all 7mm x 2 Ex te rio 5 rw all Ex te 6 rio rw all 4. Slide the external wall plate over the outer pipe protruding through the exterior wall. Align the arrow symbol to point downwards which will result in a 2° fall of the horizontal section of flue pipe towards the appliance as required.
FLUE COMPONENT ASSEMBLY CREATING A “INTERNAL WALL” FLUE INSTALLATION y Total flue length can be up to 6.5 metres long and can contain a maximum of one (1) ESBEND (1 x 90°)! b c a Activities for creating an Internal Wall flue installation: a. Assemble Flue Adaption Kit RHFE-750/752ETR & RHFE-950ETR (ASPKIT03). b. d c e Locate, Fit & Secure ASPKIT03 components. c. Locate Heater. d. Connect Heater Exhaust. e. Connect Combustion Air Hose. y. Refer to steps j. - l.
FLUE COMPONENT ASSEMBLY CREATING A “SIDEWAYS” FLUE INSTALLATION Activities for creating a Sideways flue installation: a. Assemble Flue Adaption Kit RHFE-750/752ETR & RHFE-950ETR (ASPKIT03). b y d b. Total flue length can be up to 6.5 metres long and can contain a maximum of one (1) ESBEND (1 x 90°)! e f Locate, Fit & Secure ASPKIT03 components. c. Locate Heater. d. Connect Heater Exhaust. e. Connect Combustion Air Hose. f. Cut, Fit & Secure Components (As Required). y. Refer to steps e. & f.
FLUE COMPONENT ASSEMBLY CAUTION 5 The joints between ESPIPE900 lengths MUST BE secured by a pop rivet or screw through the outer Co-ax pipes and flue pipes are to be clipped to the wall using the stand off clips supplied or other suitable method. ASPKIT03 and ESPIPE900 DO NOT require cutting to be joined. Int er i or wa ll 6 Int er i or wa ll Internal wall plate Int eri 7 or wa ll 5. Create the wall penetration(s) in accordance with the section “WALL PENETRATIONS” on page 8.
FLUE COMPONENT ASSEMBLY CREATING AN “UNDER FLOOR” FLUE INSTALLATION b Activities for creating a Under Floor flue installation: a. Assemble Flue Adaption Kit RHFE-750/752ETR & RHFE-950ETR (ASPKIT03). e f a d g c y Total flue length can be up to 6.5 metres long and can contain a maximum of one (1) ESBEND (1 x 90°)! b. Locate, Fit & Secure ASPKIT03 components. c. Create Penetration in floor. d. Locate Heater. e. Connect Heater Exhaust. f. Connect Combustion Air Hose. g.
FLUE COMPONENT ASSEMBLY 3. Pass ESPIPE900 through the internal wall plate and through the floor penetration. Then lift ESPIPE900 up and secure it to ASPKIT03 in accordance with “COMPONENT ASSEMBLY & CONNECTION ~ ESPIPE900” on page 19. CAUTION The joint between ASPKIT03 and ESPIPE900 MUST BE secured by a pop rivet or screw through the outer Co-ax pipes and flue pipes are to be clipped to the wall using the stand off clips supplied or other suitable method.
FLUE COMPONENT ASSEMBLY CUTTING ~ ASPDFK, ESPIPE900 & ESROOFCOWL CAUTION Cutting is not required for the purposes of joining ASPDFK, ASPKIT03, ESPIPE900 and ESROOFCOWL together Cutting of the last component in the flue assembly (the component furthest away from the heater) may be required to achieve the required flue system length. Cutting is also required at a wall penetration.
FLUE COMPONENT ASSEMBLY ASSEMBLING WALL TERMINAL ~ ASPDFK & ESPIPE900 CAUTION Flue must terminate in accordance with AS/NZS 5601 Figure 6.2. Especially relevant is the requirement to have a minimum of 300mm clearance between the flue terminal and the finished ground level. It is not permissible to excavate a hole to obtain the required 300mm clearance, unless there is sufficient drainage provision.
FLUE COMPONENT ASSEMBLY COMPONENT ASSEMBLY & CONNECTION ~ ESBEND CAUTION ONLY use PVC cement between externally located joints of PVC pipes to secure and seal these joints against ingress of dust and water. ONLY use non acidic silicone sealant between externally located the joints of PVC flue pipe and any mating aluminium components (such as the condensate trap) to secure and seal these joints against ingress of dust and water.
CONNECTING HEATER EXHAUST & AIR SUPPLY CONNECTING HEATER EXHAUST This section describes how to connect the exhaust pipe from the RHFE-750/752ETR & RHFE-950ETR heater to the exhaust connection on flue transition ASPDFK or ASPKIT03. CAUTION ASPKIT03 ASPDFK This joint MUST BE properly secured in accordance with these instructions using the clips provided. If this joint is not secured properly, products of combustion could disperse into the room being heated which may result in a dangerous condition.
CONNECTING CONDENSATE DRAIN TUBE TO HEATER Condensate Drain Kit Installation & Drain Connection - RHFE-750ETR and RHFE-752 . A condensate kit is provided with the heater and will need to be installed for “Internal Wall” flue installations or other vertical flue installations that will require draining of the condensate products back into the heater.
CONTACT INFORMATION CONTACT INFORMATION Australia Pty. Ltd. Product Sales and Service - National Phone: 1300 555 545* Fax: 1300 555 565* Technical Helpline and Spare Parts National (Mon-Fri 8am - 5.30pm EST) Phone: 1300 555 545* Fax: 1300 300 141* ABN 74 005 138 769 Head Office 100 Atlantic Drive, Keysborough VIC 3173 *Cost of a local call higher from mobile or public phones. E-mail: enquiry@rinnai.com.au P.O. Box 460 Braeside, Victoria 3195 For further information visit: www.rinnai.com.