Installation manual

Rinnai CVent 24
Final Checklist
Reference the Rinnai Water Heater Operaon and
Installaon Manual for proper installaon of the
Rinnai water heaters.
Clearances from the water heater unit are met.
Clearances from the exhaust terminaon(s) and
the combuson air terminaon(s) are met.
Ensure you have used the correct venng
products and that you have completely followed
the venng manufacturer’s installaon
instrucons and these installaon instrucons.
Verify that the vent system does not exceed the
maximum equivalent length for allowed.
Verify that dip switch No. 1 in the SW1 DIP switch
(tan switches) has been adjusted to OFF posion
in each water heater.
Explain to the customer the importance of not
blocking the vent terminaon or air intake.
Explain to the customer the operaon of the
water heater, safety guidelines, maintenance, and
warranty.
The installaon must conform with local codes or,
in the absence of local codes, with the
Naonal
Fuel Gas Code, ANSI Z223.1/NFPA 54
, or the
Natural Gas and Propane Installaon Code, CSA
B149.1
.
Inform the consumer if the isolaon valves are
not installed or if a water soening system is not
installed.
Verify that only models RU98i (REU-KB3237FFUD-
US) are using the common vent system.
Verify the appropriate dip switch sengs are
selected for the altude/elevaon of the
installaon locaon.
Leave this manual taped to one of the water
heaters or give the enre manual directly to the
consumer.