Installation manual

31 Rinnai CVent
A9 Final Installation Check List
All vent components are secure and fully engaged.
All seals are correctly positioned and included at every joint.
All exhaust vent runs include a minimum of a 3° incline (3/4” per ft or 5.6cm/m)
All Condensate drains tubes are connected to a drain and comply with local code.
All condensate traps have been primed.
There are no obstructions in the combustion air or exhaust vent runs.
Both intake and exhaust terminations are appropriately positioned and comply with the manu-
facturers installation instructions and local codes.
The CVent Common Vent System Installation Instructions and the Appliance Installation In-
structions have been secured to the system or provided to the end user.