Installation manual

Rinnai Australia 40 Installation Manual
HEATER INSTALLATION
Step 13. FIT THE SURROUND
For Bevelled Surround - Replace the Surround item by replacing the 2 retaining screws located on the inner
left hand and the two screws on the inner right hand sides of the burner box.
For Square Surround - Connect the RJ45 extension lead the manual control switch at the top right of the
Surround. Fit the Surround item by using the 2 retaining screws located on the inner left hand and the 2 screws
on the inner right hand sides of the burner box, cover the lower manual control switch with the blanking sticker
supplied with the square fasica.
Step 14. FITTING THE MESH GUARD & DRESS GUARD FRAME ASSEMBLY
Replace the ‘Mesh Dress Guard and Mesh Dress Guard Frame’ assembly items & by lowering onto the
top edge of the Glass Panel assembly, item , carefully swing it inward along the bottom edge of the assembly,
the assembly will ‘snap’ into location and be held in there via magnets.
Wiring inside this appliance may be at 240V potential.
Qualified persons only must carry out the exchange.
Power must be turned off to the appliance and the appliance electrically isolated.
Failing to electrically isolate the appliance increases the risk of electric shock from exposed
wiring and circuitry when cover panels are removed.
DO NOT leave the appliance unattended when power is connected and the panels are removed.
The dress guard fitted to this appliance reducing the risk of fire and injury and no part of it
should be permanently removed.
For protection of young children or the infirm a secondary guard is required.
If the heater is not operating correctly refer to the Trouble Shooting before contacting Rinnai.
It is the responsibility of the installer to check that under normal operating conditions of the
appliance, all flue gases are exhausted to the outside atmosphere and that there is no spillage
of combustion gases into the room. Please refer to AS/NZS 5601.
During the initial burning in period of approximately 2 hours, some smoke and smell may be
experienced. During this period the heater should be operated on High and the space being
heated should be well ventilated. It may take up to 20 minutes of operation for the logs to achieve
their full flame pattern and glow.
Burner aerations are factory set and can not be adjusted. If you are unable to get the unit to
operate correctly refer to Trouble Shooting section of this manual before contacting Rinnai.
3
3
3a2a
1b
1a
2b
5
3b
Bevelled Fascia
Square Fascia
Cover the lower manual control switch
blanking sticker supplied.
1
2
5
WARNING
CAUTION
WARNING
NOTE