Installation Manual
42 Rinnai Tankless Rack System (TRS) Installation Manual
Gas Supply
9
• A licensed professional must install the gas
supply.
• Turn o 120V power supply.
• Turn o the gas.
• Gas is ammable. Do not smoke or provide other
ignion sources while working with gas.
• Do not turn on the water heater or gas unl all
fumes are gone.
WARNING
Check the type of gas and gas supply
pressure before connecng the water
heaters. If the water heaters are not of the
gas type that the building is supplied with,
DO NOT connect the water heaters. Contact
the dealer for the proper water heaters to
match the gas type.
Instrucons
1
To connect the gas supply, follow the instrucons
below:
Perform a leak and pressure test prior to operang
the water heaters. If a leak is detected, do not
operate the water heaters unl the leak is
repaired.
2
Check the gas supply pressure immediately
upstream at a locaon provided by the gas
company. Supplied gas pressure must be
within the limits shown in the Specicaons
secon with all gas appliances operang.
3
Before placing the appliance in operaon, all
joints, including the heaters, must be checked
for gas ghtness by means of soap, gas leak
detector soluon, or an equivalent
nonammable soluon, as applicable. Since
some leak test soluons, including soap and
water, may cause corrosion or stress cracking,
the piping shall be rinsed with water aer
tesng, unless it has been determined that
the leak test soluon is non-corrosive.
4
Any compound used on the threaded joint of the
gas piping shall be a type that resists the acon of
liqueed petroleum gas (Propane/LPG).
5
The gas supply line shall be gas ght, sized, and
installed as to provide a supply of gas sucient to
meet the maximum demand of the heaters and all
other gas consuming appliances at the locaon
without loss of pressure.
6










