Mulple rack systems should be installed in parallel using a secondary manifold from the building’s cold and hot 
water supply. Reference the drawing on the following page for guidance on plumbing mulple racks in a parallel 
piping system.  
A low pressure gas regulator must be installed prior to the rack system. Note the maximum cumulave input for the 
system when sizing the gas regulator.  
Use common plumbing pracce and reference all applicable codes when sizing the secondary manifolds and gas 
regulator.  
Each Rinnai Tankless Water Heater on the rack system comes installed with isolaon valves and a pressure relief 
valve. Refer to the “Rinnai Tankless Water Heater Installaon and Operaon Manual” for informaon on piping the 
isolaon valves and pressure relief valve.  
Isolaon Valves 
Pressure Relief Valve 
 Plumbing 
8 
Hot Water  
Isolaon Valve 
Cold Water  
Isolaon Valve 
Pressure Relief Valve Piping 
Piping for Mulple Racks 