Installation Sheet
10 Rinnai Rack Installation
Piping for MulƟple Racks
Mulple rack systems should be installed in parallel using a secondary manifold from the building cold and hot
water supply. Reference the drawing for guidance.
A low pressure gas regulator must be installed prior to the rack system. Note the maximum cumulave input for
the system when sizing the gas regulator.
Use common plumbing pracce and reference all applicable codes when sizing the secondary manifolds and gas
regulator.
Relief Valve Piping
Each Rinnai tankless water heater on the TRS comes installed with Isolaon valves and a pressure relief valve.
Refer to the installaon and operaon manual for more informaon on proper piping for the relief valve drain.
Isolaon Valve
Pressure Relief Valve