Installation Manual
10 V53De Manual
Piping Diagram for Basic Installaon
G
a
s
S
u
p
p
l
y
3
/
4
"
C
o
l
d
W
a
t
e
r
S
u
p
p
l
y
L
i
n
e
3/4" Hot Water Supply Line
Rinnai
Water Heater
Rinnai
Equipment List
Rinnai
Water Heaters
RIK-KIT (Optional)
(3/4" Fittings Include:
2 Unions, 2 Ball Valves,
2 Drain Valves and
1 Pressure Relief Valve.)
QTY
1
1
3
/
4
"
G
a
s
C
o
n
n
e
c
t
i
o
n
For Building Fixtures
Pressure Relief Valve
3/4" Ball Valve
3/4" Union
Check Valve
S
Pressure Regulator
Circulating Pump
Solenoid Valve
Boiler Drain Valve
KEY
This is not an engineered drawing. It is intended only as a guide and not
as a replacement for professionally engineered project drawings. This
drawing is not intended to describe a complete system. It is up to the
contractor/engineer to determine the necessary components and
configuration of the particular system being installed. This drawing does
not imply compliance with local building code requirements. It is the
responsibility of the contractor/engineer to ensure installation is in
accordance with all local building codes. Confer with local building
officials before installation.
Calentador
de agua
Conexión de gas de 3/4’’
Suministro de gas
Línea de suministro de agua fría de 3/4
Línea de suministro de agua caliente de 3/4”
A los accesorios en la construcción
Válvula de bola 3/4"
Unión 3/4"
Válvula de retención
Válvula de alivio de presión
Regulador de presión
Bomba de circulación
Válvula de drenado de
la caldera
Válvula de solenoide
CLAVE