Replacement Part List

During Assembly
Make sure the base is square by measuring the diagonals and level by using a spirit level.
You may use silicone lubricant spray in order to help you slide the panels into the profiles.
Do not spray the polycarbonate panels.
Use a rubber mallet if necessary.
All panels with the stamped words "THIS SIDE OUT" must be facing out to create
full UV protection. Remove plastic sticker as panels are locked in place.
All clear panels come with a protective plastic film on both its sides and
don't have a specific direction to install. Remove the plastic film prior to installation.
(I)
When encountering the information icon, please refer to the relevant
assembly step for additional comments and assistance.
This icon indicates
that the installer should
be inside the product.
Attention
During assembly use a soft surface below the parts to avoid scratches and damages.
Steps
Step 1: Door assembly can be done from the right or left hand side.
Determine which side to place the door. The decision will affect the upcoming steps.
Steps 1, 3: Arrange all 2D connectors with the stamped word "OUT"facing out of the product.
Step 4:
Make sure the base is square by measuring the diagonals and level by using a spirit level.
Make sure that the base is leveled and anchor it to the ground with suitable screws / screws + plugs
/ spikes (not supplied) in accordance with your chosed foundation.
Step 17:
Make sure that the frame is perfectly straightened by using a spirit level.
Make sure that the frame is leveled and anchor it to the wall with suitable screws / screws + plugs /
spikes (not supplied, excluding part # BC1) in accordance with your wall surface.
The wall to which you are securing your product onto must be at a 90° to the foundation.
Reinforcement Arch Profiles
Steps 18-23:
Make sure that all the metal profiles are inserted inside the plastic profiles.
Repeat each step based on your product's size and the number of arch profiles needed to be
assembled as illustrated.
Step 27: Make sure that the profiles are perfectly straightened by using a spirit level.
Anchor Part 7937 to the wall with suitable screws / screws + plugs / spikes (not supplied) according to
your wall surface.
Step 28: Repeat Steps 24-27 according to the amount of modules purchased.
Step 30: Repeat and refer to Step 4.
Steps 39-40: Repeat and refer to Step 17.
Step 41: Seal the product's edges with Silicon Sealant.
Step 57: Insert the rubber strip (Part GF) from the outside of the product.
Cut the remaining edges.
Step 64: Insert the rubber strip, Part 7869, from the outside of the product.
During this step, turn the door in order to insert the rubber strip correctly.
Step 66: Determines door opening's direction. The door can be installed as a left or right
hand door and can be opened either to the left or to the right.
Step 69: Adjust the hinges height in accordance with the upper post and lower ramp of the
door aperture, as specified in Illustracion c.
Steps 75, 76: If the window doesn't close properly, please release the screws, adjust the
profile and re-tighten the screws.
Step 77: The door can be installed either as a right or left hand door.
Choose one of the two depicted options.
* If you choose the option of the door openeing to the wall, use suitable screws and plugs
for your wall type.
* Please tighten all screws when completing assembly.
Note: Anchoring this product to the ground and wall is essential to its stability and rigidity.
It is required to complete these stages in order for your warranty to be valid.