Instruction Manual

BRUTE IV
BRUTE IV
optional safety guard
optional safety guard
INSTALLATION INSTRUCTIONS
Do not operate or ride any motorcycle equipped with an “open” belt drive without an
appropriate safety guard or shroud installed.
Apply one(1) drop of “Blue” threadlock to the
stand-off studs.
Tighten these bolts & torque to 29 foot pounds.
Optional Brute IV accessories.
optional Billet Aluminum Guard
(chrome PP-411-C or polished PP-411)
Kick-stand stop
PP-401
optional Chrome cover
PP-106-4
Tighten studs solidly in place. If your kit included
5/16” studs torque to 29 foot pounds. If your kit
came with 3/8” studs, torque to 47 foot pounds.
Studs are ready for the guard.
Apply one(1) drop of “Red” threadlock to the
Allen bolts that hold the guard in place.
Rivera Primo
Rivera Primo 12450 Whittier Blvd. Whittier, CA 90602 Tel: (562) 907-2600 Fax: (562) 907-2606
www.riveraprimoinc.com
For the following full coverage belt guards: PP-419-P-AY & PP-420-P-AY / For the following smooth
center-guards: PP-411B, PP-411B-P-AY, PP-411B-C-AY, PP-611B, PP-611B-P-AY, PP-611B-C-AY and
slotted center-guards PP-411-P-AY, PP-411-C-AY, PP-611-P-AY, PP-611-C-AY.
2108-0007

Summary of content (1 pages)