User guide

NOTE: Replace the OEM hex-head bolt (Dyna Glide only) with the
button-head Allen bolt provided in the kit. TORQUE THE BUTTON-
H
EAD BOLT TO 29 FOOT POUNDS.
Early FXR models may need to have some material removed from
the inner primary in the area indicated by the X’s. Check
pulley/belt clearance here before tightening clutch hub nut.
This inner primary (Early
Evo) has had a tab
removed to allow belt
clearance in the area indi-
cated. Most installations
require some grinding on
the outer primary webbing.
Install front pulley. Install the
rear pulley without the belt &
check alignment as shown
(straight edge flush with rear of
ring-gear lines-up with outer
edge of front pulley). Remove
pulleys and proceed with instal-
lation. If alignment isn’t satisfac-
tory see photo 8. The provided
.100” washer can be used to
space the front pulley outward
as needed, however it may be
nesecary to use less or more
shim.
After ensuring proper pul-
ley alignment, again
check the areas indicated
in the photo for belt and/or
pulley clearance. Always
check rear-pulley and belt
clearance here before
operating the motorcycle.
5
5A
Check pulley alignment with a straight-edge
Check primary belt clearance here
Check for proper belt clearance
I
nstall buttonhead Allen bolt
4
Apply a thin coat of grease to
the splines of the transmission
main-shaft to act as both a cor-
rosion inhibitor, & lubricant.
The grease also acts as a cush-
ion for the splines on the trans-
mission main-shaft during
operation.
5B
Apply grease to the main-shaft splines
Install the rear pulley (clutch bas-
ket) & belt. Apply 2 drops of blue
thread-lock to the main-shaft
threads as shown. INSTALL THE
CLUTCH HUB NUT (WITH SEAL),
& TIGHTEN TO 70-80 FOOT
POUNDS OF TORQUE. The cen-
ter adjustment screw/sealed nut
combination prevents transmis-
sion oil from leaking thru the
main-shaft into the clutch pack.
6
Install rear pulley & belt.
A .100 washer may be
needed behind the front
pulley on some Dyna-Glide
& Softail applications.
7
Install washer as needed.
3
Install front pulley, washer & inner/outer
guides. Use 1-2 drops of blue thread-
lock on the threads of the motor shaft.
INSTALL & TIGHTEN NUT TO FACTORY
SPECS (150-165 FOOT POUNDS) using
a quality torque wrench or air impact
driver.
8
Shims are manufactured from high quality steel, precision
ground for parallel & flat surfaces to ensure perfect pulley
alignment. Correct pulley alignment & correct belt tracking
are a must for long belt life. These shims make pulley align-
ment easy. Shims are available in .020", .030", .050", .075" &
.100” thick dimensions, or sets of "one-of-each.”
Optional pulley shims kit
Part # 2100-0066
Includes one each of
.020”, .030”, .040”,
.050” and .100”
Friction plate 2nd, then alternate
steel, friction, steel, friction. The
clutch plates should be installed in
the same order as delivered.
The clutch pack height is pre-
set prior to shipment, &
should not be altered without
consulting a Primo technician.
Friction Plate plate second...
I
nstall the pressure plate as shown.
A
pply a generous dab of high
quality anti-seize to each of the
Pro-Clutch studs (as shown).
Install the pressure plate
11
Instal l th e diaphragm spring, sp r i ng retainer (beveled si d e inward against
the s pring) l o c k ing tabs, a nd shoulde r e d nuts a s shown. TIGHTEN T H E
NUTS EQUALLY UNTILTHEY BOTTOM, & THEN T IGHTEN TO 3 0 INCH P OUNDS
OF TORQUE. B e nd a ta b over eac h nut to k eep it ti g ht! Sprin g adjustment
(and clutch p a c k height) is esta b l i shed pri o r to s h i p ping.
Clutch a d j ustment: R u n t h e clutch cable a l l t he way out unti l t h e clutch
lever t o u c hes the handl e b a r grip. Then ru n t he center adju s t i ng screw in
until it touch e s the p u s hrod, b a c k it o u t 1/4 t u rn and tighten t h e jam n ut.
Adjust t he clutch c a b l e for 1/8 f ree play. Note: Braided clut c h cables
requir e little o r no f r ee play.
Install the locking tabs & retainer, & adjust the clutch.
12
Belt s h ould have 3 / 4-to-1 o f up & down p lay when t h e drive t r a i n is cold. R e-install t h e outer pri m a r y
cover and che c k belt c learance. I nstall a louvered or v e nted der b y or i n s pection c o v er, a nd your e ready
to ri d e . Check be l t tension after the d rive train reaches no r m a l operatin g temperature . The belt s hould
feel snug but not exc e s s ively tig h t !
13
AT T E NTION!
Always check the clearance between the OUTER PRIMARY
COVER, & the belt drive assembly PRIOR TO OPERATING THE
MOTORCYCLE with a new belt drive, particularly with 95 and
later motorcycles.
After installing the .120”
steel drive plate, Install
the rest of the clutch pack
per steps 10 and 11.
9
UPDATED CLUTCH HUB INFORMATION
Install the .120” thick steel plate at the
rear of the clutch pack as shown. The
clutch pack can then be installed.
.120” thick Steel Plate plate first.
P
rimo’s new clutch hub uses a .120” thick
s
teel plate at the back of the clutch pack
r
eplacing the permanently attached alu-
m
inum backing plate of the earlier model
c
lutch hub. See drawing.
10
BELT SHOULD HAVE
1/2” - TO - 1” UP & DOWN
PLAY WHEN THE DRIVE
TRAIN IS COLD!
2
3