User's Manual

BLACKHEAT
®
INSTALLATION OPERATION AND SERVICE MANUAL
8 of 74
3.3 Clearance Data -U Tube
NOTE: 1. All dimensions are from the surfaces of all tubes, couplings, tees, elbows and crosses.
2. Clearances B, C and D can be reduced by 50% after 7500 mm of tubing downstream
from the burner.
3. All measurements are in millimeters.
4. Add 60 mm clearance to uncovered U-tube.
FIGURE 11: U-TUBE, HORIZONTAL MOUNT
Model
BH15UT
BH20UT
BH25UT/EF
BH30UT/EF
BH35UT/EF
BH40UT/EF
BH45UT/EF
BH50UT/EF
A 150 150 150 150 150 150 200 200
B 890 970 970 1020 1170 1220 1270 1380
C 1580 1730 1730 1910 1980 2050 2110 2210
D 760 940 940 1000 1090 1150 1200 1300
A
C
D
B
FIGURE 12: U-TUBE, ONE SIDE REFLECTOR
Model
BH15UT
BH20UT
BH25UT/EF
BH30UT/EF
BH35UT/EF
BH40UT/EF
BH45UT/EF
BH50UT/EF
A 150 150 150 150 150 150 200 200
B 230 230 230 230 230 230 230 230
C 1580 1760 1760 1930 2090 2130 2160 2240
D 1200 1380 1380 1500 1660 1710 1760 1860
A
C
D
B
FIGURE 13: U-TUBE, TWO SIDE REFLECTORS
Model
BH15UT
BH20UT
BH25UT/EF
BH30UT/EF
BH35UT/EF
BH40UT/EF
BH45UT/EF
BH50UT/EF
A 150 150 150 150 150 150 200 200
B 590 640 640 690 820 860 890 1020
C 1660 1810 1810 1960 2110 2160 2210 2320
D 590 640 640 690 820 860 890 1020
A
C
D
B
FIGURE 14: U-TUBE, FULL 45° MOUNT
Model
BH15UT
BH20UT
BH25UT/EF
BH30UT/EF
BH35UT/EF
BH40UT/EF
BH45UT/EF
BH50UT/EF
A 200 200 200 200 200 200 200 200
B 200 200 200 200 200 200 200 200
C 1500 1650 1650 1860 1960 2040 2110 2160
D 1070 1170 1170 1320 1550 1620 1680 1780
B
C
D
A