Product Brochure

1407
5. INSTRUCTIONS
Preparation
Concrete moisture vapor emissions must not exceed 3 lbs. /1000 sq. ft. /24
hours and pH must not exceed 9. Suboors must be structurally sound, dry,
smooth, flat ( 3/16" within 10'), level and free of excess moisture/alkali and all
substances (oil, wax, grease, paint, oil based sealers, adhesive residue, etc.)
that may inhibit the bond of the adhesive or the performance of the flooring or
its installation.
All substrate cracks, chips, holes, joints, high spots and irregularities must
be adequately repaired. Expansion or other moving joints must not be filled
or covered with flooring. Patching compounds must be suitable for the use
application, cement based and polymer-modied, and applied according to the
manufacturers instructions.
Installation
This product is ready to use and does not require mixing. Materials and area
temperature must be between 65 - 95° F with a maximum RH of 65% for 48
hours before and during installation as well as for 72 hours afterward. Large
temperature or humidity increases or decreases can affect the flooring and
performance of the installation. Refer to flooring manufacturer’s specific
recommendations and industry standards. Lift a board periodically to ensure
100% coverage of adhesive to the flooring backing and the substrate to ensure
a void free bond. This product is not photochemically reactive.
Ensure the appropriate expansion areas are left around the perimeter of the
room and stationary objects. Spread adhesive uniformly. Adhesive ridges
should be of sufficient height to achieve full coverage of the substrate and the
deepest recesses in the back of the wood flooring.
Place flooring into the adhesive while the adhesive is still fresh. Do not allow
adhesive to “skin over.” The amount of time in which you have to place the
flooring will vary with temperature and humidity.
Curing
Up to 8–10 hours. High temperature and low humidity will cause the adhesive
to cure faster.
After installation, restrict foot traffic and moving of heavy objects for 2448
hours to allow adhesive to cure properly. Premature traffic can cause
installation failure.
Clean-up
Fresh adhesive warm, soapy water.
Dried adhesive – use mineral spirits sparingly with a clean, white cotton cloth.
DO NOT POUR DIRECTLY ONTO FLOORING.
6. AVAILABILITY
Packaging
4 gallon Plastic Pail (15.14 L) 1407-4 075378140740
1 gallon Plastic Pail (3.78 L) 1407-1 075378140719
30 ounce Cartridge (887 mL) 1407-30C 075378140702
7. WARRANTY
Roberts warrants that this product will be free from manufacturing defects
for 12 months from the date of purchase, when applied in accordance with
Roberts’ instructions and industry standards. Roberts’ sole liability is to
either supply new product or refund the original purchase price. This limited
warranty excludes all other express warranties including the warranties
of merchantability for a particular use or purpose. Any implied warranties
arising by operation of law are limited to one year. Roberts will not be liable for
any incidental or consequential damages.
Visit www.robertsconsolidated.com for full warranty details.
8. MAINTENANCE
Not applicable.
9. TECHNICAL SERVICES
For technical assistance or installation questions not covered in this
document, please contact our Technical Services Department at
(706) 277-5294 or visit robertsconsolidated.com.
10. FILING SYSTEM
Division 9
10495
Roberts
®
, GoldGuard
®
, and the e
®
logo are registered trademarks of Roberts Consolidated Industries, Inc. • Q.E.P.
®
is a registered trademark of Q.E.P. Co., Inc.
‘LEED
®
’ and related logo is a trademark owned by the U.S. Green Building Council
®
Q.E.P. Co., Inc.
1001 Broken Sound Parkway, NW
Boca Raton, FL 33487
www.qepcorporate.com
www.robertsconsolidated.com
Customer Service: (866) 435-8665
Technical Assistance: (706) 277-5294
Updated: May 1, 2017