Specifications

Surface to Surface
M3-G
Mixing Operation
Operate engine at high speed.
Open butterfly valve at bottom of hopper where it joins the venturi mixing tee.
Introduce the dry or liquid raw material into the hopper.
Suction created by the venturi mixing tee will draw the raw material into the jet stream for initial mixing.
Flush jetting tee with wash wand.
Close the butterfly valve on the hopper to keep debris out of the system.
Allow the mixing system to circulate the product until the desired consistency is attained.
READ CAUTIONS AT FRONT OF MANUAL REGUARDING THIS OPERATION!
Transferring Operation (product outflow)
On the left end of the skid base, you will see a 1-1/2 in. ball valve (1-1/2”NPT.) connected to the filter /
shear housing of the M3-G marked “Drill Fluid”.
A transfer hose with a minimum size of 1-1/2 in. is to be attached to the ball valve to carry the finished
product to a holding tank or direct to the drill rig.
Make the necessary connections at the holding tank or drill rig.
Run the M3-G pump at favorable speed and open the ball valve to allow the flow to the holding tank or
drill rig.
The speed and pressure of the fluid outflow is determined by the engine speed and valve setting.
READ CAUTIONS AT FRONT OF MANUAL REGUARDING THIS OPERATION!
Daily Shut Down
Set the speed control lever at the low speed position and allow the engine to run at low speed for 2 or 3
minutes.
Rotate the stop button until the engine stops. Do not stop engine suddenly while running at high speed.
Close the fuel cock.
Pull the recoil starter handle slowly until resistance is felt and then return the handle to its original
position. Note
- This operation is necessary to prevent outside moist air from intruding into the combustion
chamber.
Close any valve(s) installed on suction line between pump and tank.
Remove filter / shear as described in maintenance section.
Clean filter / shear as described in maintenance section.
READ CAUTIONS AT FRONT OF MANUAL REGUARDING THIS OPERATION!