Operation Manual
V0214 D 510 45
NederlandsFrançaisEnglishDeutsch
Electrical connections (Fig.3-4)
The electrical connections must be carried out by a qualied electrician who is able to
calculate the exact needed wire section and caliber of fuses.
- Check that the mains voltage of your machine corresponds with the voltage in your workshop.
- Open the electrical connection box at the side of the machine (g, 2).
- Connect the three phases to the terminals marked L1, L2, L3 (g,3).
- The neutral conductor (blue) it is to be connected to the terminal N.
- Connect the earthing (green-yellow) to the terminal marked with the earth symbol PE.
ATTENTION:
- Check rst if the spindle runs free and if all protections are mounted before starting up the machine.
- If the rotation direction of the spindle is not correct, the leads L1, and L2 must be exchanged.
- The rotation direction of the spindle is anti-clockwise: left, seen from the side of the machine with
the dust chute open.
ATTENTION:
The machine is equipped with overload protection, and should the motor be shut-off by this protection,
it is necessary to wait for a few minutes untill the overload has cooled down, and resets itself.
Fig.4
Fig.3