
23
1.  Press the On/Off button   to 
power on the meter.
2.  Once the Power Up screen 
appears, touch 
 to proceed 
to the Operator ID screen, or 
wait 5 seconds and the meter 
automatically proceeds to the 
Operator ID screen.
Control Testing
How to Perform Control Testing