Appendix A PowerMonitor 1000 Data Tables
Table 33 - Demand Results Parameters
CSP File No. F24
CIP Instance 17
No. of Elements 9
No. of Words 18
Data Type Float
Data Access Read
Table 34 - Demand Results
Element
No.
Modbus
Address
Element Name Range
TR1
TR2
EM1
EM2
EM3
Description
0 30501-2 kWatt Demand +/- 0.000…9,999,999 ••The average real power during the last
demand period.
1 30503-4 kVAR Demand +/- 0.000…9,999,999 ••The average reactive power during the
last demand period.
2 30505-6 kVA Demand 0.000…9,999,999 ••The average apparent power during the
last demand period.
3 30507-8 Demand PF -100.0…+100.0 ••The average demand for PF during the
last demand period.
4 30509-10 Projected kWatt
Demand
+/- 0.000…9,999,999 ••The projected total real power for the
current period.
5 30511-12 Projected kVAR
Demand
+/- 0.000…9,999,999 ••The projected total reactive power for
the current period.
6 30513-14 Projected kVA
Demand
0.000…9,999,999 ••The projected total apparent power for
the current period.
7 30515-16 Elapsed Demand
Period Time
0.00…99.99 ••The amount of time that has elapsed
during the current period.
8 30517-18 Metering Iteration 0…9,999,999 ••Increments by 1 for each new metering
calculation.