Configuration Manual Owner manual

Publication 1757-PM002A-EN-E - June 2006
Applications 4-17
When you have added all the of Blocks and their Parameters, your H1-1
Fieldbus network should look similar to the one below.
Create a Fieldbus Control Strategy
1. In the Project window, right-click the Area 1 icon and select New
Process Cell.
2. Enter >PID Loop< for the Tag and click OK.
The Process Cell is added to the Project.