Configuration Manual Owner manual

Publication 1757-PM002A-EN-E - June 2006
4-18 Applications
3. Right-click the Process Cell icon and click Expand.
The Process Cell window opens.
4. In the Process Cell window, right-click the Process Cell icon and select
New Control Module.
5. Enter >Pressure< for the Tag and click OK.
The Pressure Control Module is added to the Project.
6. Right-click the Pressure icon and select Strategy.
The Strategy window opens.
Add Function Blocks to the Strategy
1. In the Strategy window, click Options Function Block Icons
Rectangle.
2. Drag and drop the FFLD LGX, FI302 AO and LD292 AI blocks from
the H1-1 Fieldbus window to the Strategy window to resemble the
picture below.
Create Links
To create Fast Links, refer to the linking device user manual, publication
1757-UM010.
1. In the Strategy window, click the Link button .
2. Click the AI Block.
The Output Parameter Selection window opens.
3. Select the OUT pin.
The pin fills to show that it is selected.