Installation and Upgrade Guide Owner's manual

Publication 1757-IN040B-EN-P - March 2002
ProcessLogix Server Upgrade Procedures 4-9
2. Logon to SERVERB as ps_user.
Synchronizing Server Databases on Redundant Servers
The following can be performed on the Primary or Backup Server.
1. Click Start
ProgramsProcessLogix ServerStation.
2. Click View
System StatusServer Redundancy to call up the
Server redundancy display.
3. Click the Oper field in the lower right corner of the display.
4. Key in >mngr< in the Station Logon prompt and click OK.
5. Click Synchronize. When the Synchronize Databases (Y/N)
prompt appears, key in >Y< in the entry field above the display
and press <Enter>.
6. Wait for the synchronization to complete (“Synchronization
Complete” prompt appears) and verify that the display shows
simulated Green LED indications for the following states:
Primary Server
Running
Backup Server
Synchronized
Running
Link Status
Link 0 (LNK00) - Active link
7. Click Station
Exit.
8. Click Yes to exit Station.
IMPORTANT
All R400.0 Systems are required to use the ps_user
account. This is a change from R320.0, where most
systems used the plx_user account.