User Manual

Table Of Contents
maintenance 523-0809018
4.7. TEST EQUIPMENT AND POWER REQUIREMENTS.
Test equipment required to perform t he post-installation test procedures is below. Other equipment may be entirely s atisfactory if it
meets the specications and is calibrated as necessary.
Combined TCAS/Transponder test set (such as the IFR-6000), or a TCAS test set and a transponder test set
Pitot Static Ramp Tester
Radio Altimeter Ramp Tester.
4.7.1. P
ower Requirements.
All power required to perform the system tests and trouble shooting is provided by the aircraft in which t he system is installed.
4-14