User Manual

Preparing for Use
R&S
®
FPL1000
12Getting Started 1323.1602.02 ─ 03
Unpacking and Checking the Instrument........................................................ 12
Accessory List................................................................................................. 13
Placing or Mounting the Instrument................................................................ 13
Connecting the AC Power...............................................................................16
Changing the AC Supply Fuse........................................................................16
Connecting an Optional DC Power Supply (R&S FPL1-B30)......................... 17
Connecting an Optional Battery Pack (R&S FPL1-B31)................................. 17
Switching the Instrument On and Off.............................................................. 18
Performing a Self-Alignment........................................................................... 19
Checking the Supplied Options.......................................................................20
3.1.1 Unpacking and Checking the Instrument
Check the equipment for completeness using the delivery note and the accessory
lists for the various items. Check the instrument for any damage. If there is dam-
age, immediately contact the carrier who delivered the instrument. Make sure not
to discard the box and packing material.
Packing material
Retain the original packing material. If the instrument needs to be transpor-
ted or shipped later, you can use the material to protect the control ele-
ments and connectors.
Putting into Operation