Getting Started Guide

Preparing for Use
R&S
®
QPS201
14Getting Started 1179.3438.02 ─ 02
6 Preparing for Use
Installing the R&S QPS requires experience and must be performed by trained person-
nel. For a comprehensive description of the initial installation and configuration of the
R&S QPS, refer to the installation manual.
Once the scanner itself is installed, you can connect the accessories like the operator
touchscreen.
Connecting devices
All required cables are part of the delivery.
AC
AC ACAC
Scanner
AC
Primary Panel
Resolution
Station 1
Resolution
Station 2
Resolution
Station 3
Resolution
Station 4
Touchscreen
(operator)
Optional:
WTMD metal
detector
LAN
LAN
LAN
USB / DisplayPort / Power
LAN +
Remote Power
AC
AC
Secondary Panel
Mandatory system components
Optional system components
LAN
LAN
Figure 6-1: Connection overview
The overview shows the connections for HW 3.50. For HW 3.30, the touchscreen is
connected to a wall outlet instead of the primary panel. Otherwise the connections are
the same for both hardware variants.
The connections for the R&S LPS correspond to those of a R&S QPS HW 3.50.
LAN connections
All devices connected to the R&S QPS must be in the same subnet.
Connecting the panels
Connect the secondary panel to the primary panel.
a) Establish a LAN connection between the two panels.
b) Establish a remote control power connection between the two panels.
Connecting the operator touchscreen
Connect the operator touchscreen to the primary panel.