User Manual

Putting into Operation
R&S
®
RT-ZHD07/15/16/60
24User Manual 1800.2588.02 ─ 01
Figure 2-3: Hand held / unsafe areas
3. Connect the clips to the DUT.
4. Connect the input leads to the probe control box (4 mm safety banana jack).
Shock hazard caused by high voltages
Disconnect the probe from the DUT before disconnecting the probe from the measur-
ing instrument.
Keep the probe control box and the probe cable away from the circuit being measured.
2.5 Reducing noise induction
Twist the input leads to cancel noise that is induced into the input leads.
Input leads that form a large loop area pick up any radiated electromagnetic field that
passes through the loop. The fields induce noise in the input leads that appears as a
differential mode signal. Twisting the leads minimizes the loop area.
Reducing noise induction