User`s manual
3 Replacement of Main Parts
37
3
4
3
Move the Head Carriage to the left end.
Remove the X Motor Cable from the XY Junction
Board.
Remove the X Motor together with the Flange from the Drive
Belt.
2
3-2 X Axis Motor_Replacement (Referential Time : 20 minutes)
XY Junction Board
Remove the Spring and after that remove the screws fixing
the Flange.
There are the collars on the lower left and upper
right side of the screws. Be careful not to lose
them.
X Motor
Cable
Screws
Spring
Drive Belt
Flange
Screws with the collar
Remove the X Axis Rail Cover, Rail Cover and Right
Side Cover.
1
X Axis Rail Cover
Right Side Cover
Rail Cover
Drive Belt
X Motor