User`s manual

3 Replacement of Main Parts
59
3
2
3
Move the Carriage to the Right side by hands.
4
Remove the Junction Board Cover.
Remove the screws as the figure and after that, shift the
Junction Board Base behind from the Carriage.
3-7 X Belt_Repalcement (Referential Time : 30minutes)
Junction Board
Cover
Junction
Board
Base
Screws
Be careful the Limit SW. It is possible to break it
when you shift the Junction Board Base.
Carriage
1
Remove the X Axis Rail Cover, Rail Cover and Right
Side Cover.
Right Side Cover
X Axis Rail Cover
Rail Cover
Spindle Cover