Installation Guide
VITREOUS CHINA VANITY TOP
REV. 160801
PRODUCT INSTALLATION
2
A RONBOW COMPANY
INSTALLATION
1
Vanity top preparation
□ Install the faucet into the pre-drilled locations of the
vanity top (Faucet and Drain not included).
□ Follow the manufactures installation instructions to
install the faucet and drain.
□ Do not over tighten the faucet system to avoid
unnecessary damage to the vanity top.
2
Vanity preparation
□ The vanity should be set in place per the
manufactures installation instructions (Vanity not
included).
□ Use a light damp cloth to wipe any dirt or dust from
the top edge of the vanity.