Installation Guide

www.roofaquaguard.com
Marketing, Sales & Technical Support:
Nemco Industries Inc.
4655 Caulfeild Drive
West Vancouver, BC V7W 1E9
Tel: 1 888 840 3435
nemco2@telus.net
Manufactured by:
All material must be installed in
compliance with applicable codes
and ordinances
INSTALLATION INSTRUCTIONS:
Peel and stick ice & water guard
SUBSTRATE PREPARATION:
APPLICATION GUIDELINES
Lemminkäinen Rakennustuotteet OY
PL 10,
04361 Tuusula, Finland
s $O NOT INSTALL UNDERLAYMENTS DIRECTLY ON OLD ROOF COVERING
s #HECK WITH THE -ANUFACTURER OF -ETAL 2OOFING FOR ANY SPECIAL
REQUIREMENTS WHEN UNDERLAYMENT IS INSTALLED UNDER METAL
ROOFING WHICH DO NOT HAVE PROPER VENTILATION
s 5NDERLAYMENTS ARE AIR AND VAPOR BARRIERS THEREFORE ALWAYS
PROVIDE PROPER ROOF INSULATION AND VENTILATION
s 2EPAIR HOLES TEARS AND DAMAGE TO MEMBRANE WITH A ROUND
PATCH OF MEMBRANE EXTENDING PAST THE DAMAGED AREA INCHES
s -AY BE APPLIED DIRECTLY TO PLYWOOD WOOD COMPOSTION BOARD
POLYISOCYANURATE EXTRUDED AND EXPANDED POLYSTYRENE INSULATION
GYPSUM SHEETING AND WOOD PLANK
s For BEST ADHESION, ligHTLY Prime wood and masonrY SUBSTrates.
s Primer must BE FULLY CUrED Prior tO MEMBrANE APPLIcation.
s Deck maY NOT Have voids or arEAS THat arE UNSUPPorted.
s Deck must Be clean and drY OR LOSS OF ADHESION MaY occur.
s !LWAYS START INSTALLATION FROM THE LOWEST PART OF THE ROOF DECK
s !LIGN THE MEMBRANE ON THE LOWER EDGE OF ROOF
s 0ULL BACK THE SPLIT RELEASE FILM TO EITHER SIDE OF THE MEMBRANE
s &OR IMPROVED ADHESION ROLL OVER EDGES AND SEEMS WITH A HAND ROLLER 5SE A FLAT
BROOM OR SQUEEGEE TO HELP LAY FLAT AND ADHERE THE FIELD OF THE UNDERLAYMENT
s 6ALLEY AND 2IDGE APPLICATIONS #ENTER THE SHEET OVER VALLEY OR RIDGE PEEL BACK
THE SPLIT RELEASE FILM AND PRESS FIRMLY INTO PLACE !LWAYS START FROM THE LOWEST
POINT ON THE VALLEY APPLICATIONS
s 7HERE NAILING IS NEEDED FOR STEEP SLOPE APPLICATIONS BACKNAIL AND COVER NAILS
BY OVERLAPPING WITH THE NEXT SHEET
s %ND LAPS MUST BE AT LEAST INCHES AND SIDE LAPS MUST BE AT LEAST INCHES
s &OR BEST ADHESION APPLY IN MINIMUM & OR HIGHER
s 3TORE ROLLS AT TEMPERATURES BETWEEN  AND  &AHRENHEIT
Refer to Peel and sTICK HIGH temPerature manufacturer’s installation instruc-
TIONS !LL -ATERIAL MUST BE INSTALLED IN COMPLIANCE WITH APPLICABLE CODES AND
ORDINANCES !PPROVALS -EETS !34- $
PRECAUTIONS and LIMITATIONS:
s !LWAYS WEAR FALL PROTECTION WHEN WORKING ON A ROOF DECK
s !LL UNDERLAYMENTS CAN BE SLIPPERY WHEN WET OR COVERED BY FROST
s 2EMOVE RELEASE LINERS SOONEST POSSIBLE FROM WORK AREA AS THEY CAN
BE SLIPPERY
s &OLLOW MAXIMUM RECOMMENDED EXPOSURE GUIDELINES WHEN
EXPOSING UNDERLAYMENTS TO SUNLIGHT
s $O NOT FOLD UNDERLAYMENTS OVER THE REOOF EDGE UNLESS IT IS
PROTECTED BY FLASHING MATERIAL
SAFETY, STORAGE and HANDLING
s 2EAD ALL PRODUCT LABELS AND -ATERIAL 3AFETY $ATA 3HEETS -3$3
FOR PROPER HANDLING AND DISPOSAL
s $ELIVER ALL MATERIALS IN MANUFACTURERS UNOPENED PACKAGES
s 0ALLETIZED MATERIAL SHOULD BE STACKED ONLY TWO HIGH
s 3TORE ALL MATERIALS UNDER COVER
s !VOID PROLONGED STORAGE ABOVE # &
Products
L
I
M
I
T
E
D
W
A
R
R
A
N
T
Y
35
YEAR
MT & MT-HT

Summary of content (1 pages)