NLUO PMC CONTRACTOR
SIGNATURE AND SEAL SIGNATURE AND SEAL SIGNATURE AND SEAL
diagram with LED indication should be provided.
37. ALARMS: AC failure, DC failure, Load on
bypass, Battery test failure, over/under
temperature, overload.
38. OPERATING TEMPERATURE: 0-40 deg C
39. COLLING: Forced air Cooling
GENERAL POINTS
40. MANNUAL: One no. of manuals for operation
and maintenance in hard copy form.
41. Supplier has to install and commission the
equipment at our site.
42. Warranty: 12 months from the date of
commissioning against manufacturing defects or
faulty workmanship.
43. The manufacturer should have his service center
in Cuttack/Bhubaneswar for last 7years with toll
free No.
44. User list along with detailed address and contact
number of customer and customer’s feedback
report to whom similar equipment has been
supplied to be submitted along with quotation.
22. PRECISION AIRCONDITIONING UNITS FOR SERVER ROOM / PATCH ROOM / NETWORK ROOM
1.0. Scope
Scope of this section comprises the supply, installation, testing and commissioning of Precision Airconditioning
Systems. The units shall be manufactured in a factory/production facility which is into manufacturing such PACs for at
least last five years in India.