Specifications

164
NLUO PMC CONTRACTOR
SIGNATURE AND SEAL SIGNATURE AND SEAL SIGNATURE AND SEAL
On completion of the installation work, a certificate shall be furnished by the contractor, countersigned by the certified
supervisor under whose direct supervision the installation was carried out. This certificate shall be in a prescribed form as
required by the local Electric Supply Authority.
19. SPECIAL SPECIFICATIONS :
(a) Before fixing all switches, fittings etc. should be produced before Engineer in Charge and get approved.
(b) All metal switch boards and switch / regulator boxes to be used in work shall be painted with two coats of anti rust primer
(red oxide paint) prior to erection. After erection they shall be again painted with two coats of enamel paint of approved
quality.
(c) Before execution of any portion of conduit work for wiring neat proper layout should be made out by the contractor and
got approved from the Engineer-in-charge. For this purpose contractor is advised to get acquainted with the layout
Tendered Drawings of the Consultant / Architect.
(d) While laying the conduits for concealed wiring in the ceiling or in the beams and columns and before casting the contractor
must ensure that all the inlets and both ends of the conduits are plugged by means of dead end socket so that no foreign
matter can enter the conduits and choke them.
(e) Damage to any fitting during erection and before handing over the installation by contractor shall be set right or replaced
by the contractor at his own cost.
(f) Caution Board or proper size wherever required, shall be provided, as per I.E.E. regulations for which no extra payment
will be admissible.
(g) Any repairs done to wall etc. should match with the surrounding surface otherwise same will be got done through Building
Contractor at the cost of the Electrical Contractor.
(h) Earthing installation shall be done in the presence of Engineer-in-charge or his representative.
(i) The installation should not be enertized without adequate earthing.