Specifications
174
NLUO PMC CONTRACTOR
SIGNATURE AND SEAL SIGNATURE AND SEAL SIGNATURE AND SEAL
Before the completed installation is put into service or handed over to owner, the installation is to be subjected to the above
tests to the satisfaction of the Engineer-in-charge. The completed work will be taken over only if the results are acceptable to
the Architects / Owner.










