12. The warranty given by the manufacturing company on any material to be used at site by the contractor shall be
in the name of the “Vice Chancellor National Law University, Odisha”.
13. The contractor should study the Tendered Drawings properly and visit the site for analyzing the site condition
before quoting the rates.
14. During AMC Period , the contractor will repair the defective materials within 24 Hrs after getting complain
from NLUO. If the contractor fails to repair the same then NLUO will recover 5times the amount required for
repairing the material from the contractor.