Specifications
70
NLUO PMC CONTRACTOR
SIGNATURE AND SEAL SIGNATURE AND SEAL SIGNATURE AND SEAL
2. If adhoc payment is made, it should be mentioned Net value since previous specifically.
Bill
C E R T I F I C A T E
The measurements on the basis of which the above entries for the Running Bill No.____ were made have been taken jointly on
_________________________________________
and are recorded at pages________________ to _____________________of measurement book No.__________________.
_______________________ _____________________ _________________
Signature and date of Signature and date of PMC Signature and date of
Contractor site engineer.
The work recorded in the above-mentioned measurements has been done at the site satisfactorily as per tender Tendered Drawings,
conditions and specifications.
Architect/Consultant. Site Engineer/ N.L.U.O’s Engineer