NLUO PMC CONTRACTOR
SIGNATURE AND SEAL SIGNATURE AND SEAL SIGNATURE AND SEAL
INTERIOR AND FURNISHING WORKS
NOTE: IN ALL CASES THE TENDERED DRAWINGS/DETAIL TENDERED DRAWINGS SHALL SUPERSEDE
THE B.O.Q.
ALL WORKING TENDERED DRAWINGS SHALL BE SUBMITTED AT THE TIME OF EXECUTION OF
WORK.
TECHNICAL SPECIFICATION OF MATERIALS
1. Materials shall be of the approved quality best obtainable. A list of materials of approved brand and manufacturer is indicated in
the annexure. Testing of materials of approved brand may have to be done at the decision of Architect & NLUO.
In case, some reason or other materials are required to be obtained from any manufacturer other than those listed, then prior
approval from Architects/NLUO will be necessary supported by relevant test certificates qualifying the required standard.
Further tests as directed by the N.L.U.O/Architect’s Engineer shall also be carried out by the supplier at their own cost, if
required.
2. Sample of all materials shall be got approved by Employee/Architect before placing order & the approved sample shall be
carefully preserved in an appropriate manner at the site office for verification from time to time.
3. For standard bought out item, the size manufactured by the firms listed shall prevail when there is discrepancy in the size
mentioned in the schedule without any financial adjustment.
4. It shall be obligatory for the supplier to furnish certificate, from manufacturer or the material supplier, that the work has been
carried out by using their material and as per their recommendations.
CARPENTARY AND JOINERY WORKS
1. FRAME :
Door/ Windows frames shall have cut rebates. Planted rebates unless shown in Tendered Drawing shall not be
permitted.