Specifications

97
NLUO PMC CONTRACTOR
SIGNATURE AND SEAL SIGNATURE AND SEAL SIGNATURE AND SEAL
catch,lock etc as per Tendered Drawing including all materials, labours, T&P, taxes, royalties, transportation etc. all complete as
per the Tendered Drawing and direction of Engineer-in-charge.
20.0 WHITE BOARD :
The White board should be made from imported ceramic enameled steel surface of porcelain enameled fused at high
temperature on steel surface which has very high surface hardness and excellent abrasion resistance, scratch resistance(no
ghosting) which can be used as projector screen on surface under normal usage ,which accepts magnets and high visibility from
corners ,for smooth writing and effortless erasing and the cost shall be including the cost of all materials, labours, T&P, taxes,
royalties, transportation etc. all complete as per the direction of Engineer-in-charge.
21.0 NAME PLATE OVER BUILDING : (STAINLESS STEEL)
Supplying and fixing of name plates over building shall be of 3d SS 304 grade letters of base height made out of SS plate at all
location and height including all material, labour, T&P royalties, taxes, wastage, transportation, installation etc. all complete.
The height of letter should be 900mm and width is 800mm(appx.).
Supplying and fixing of name plates over building shall be of 3d SS 304 grade letters of base height made out of SS plate at all
location and height including all material, labour, T&P royalties, taxes, wastage, transportation, installation etc. all complete.
The height of letter should be 600mm and width is 475mm(appx.).
22.0 NAME PLATE OVER DOOR : (STAINLESS STEEL)
Supplying and fixing of name plates of size 100mm x 300mm over officer's and teachers chamber door shall be of specified size
as per Tendered Drawing and design made out of 316 L grade matt finish stainless steel plate with single colour embosed letters
which shall be fixed to the door / partition wall using 12 mm x 25 mm stainless steel stud all complete as per direction of
Engineer-in-charge. The job is comprising of all material, labour, T&P royalties, taxes, wastage, transportation, installation etc.
all complete.