User's Guide
Table Of Contents
- Contents
- About this manual
- 1 Introduction
- The TankRadar Pro System
- Measurement Principle
- 2 Mechanical Installation
- Socket Requirements
- Free Space Requirements
- Dimensions
- Tools
- Mounting the Rod Antenna
- Mounting the Cone Antenna - PTFE sealing
- Mounting the Cone Antenna - Quartz Sealing
- Mounting the Cone Antenna - Process Seal
- Mounting the Parabolic Antenna
- 3 Electrical Installation
- Identication of Installed Options
- Junction Box
- External Connections
- Connecting to a TRL2 Bus Interface
- Connecting HART devices
- Connecting the Display Panel
- Cables
- Safety
- Power Supply
- Grounding
- System Overview
- Internal Connections
- 4 Pro Setup Software
- System Requirements
- Installing the Pro setup software
- Starting the Pro Setup Program
- Setting a Password
- Logging on to a password protected system.
- Setting measurement units
- Installing a Pro Transmitter
- Viewing Level Data
- Service
- 5 Using the Pro Display Panel
- Operation
- Viewing Level Data
- Installing a Pro Transmitter
- Service
- 6 Tank Distances
- Definitions
- Examples
- 7 Technical Information
- Technical Data
- Display Panel
- Analog Outputs
- 8 Troubleshooting
- Display Panel Error Messages
Saab TankRadar
®
Pro Mechanical Installation
2-11
Edition 2. Ref. No: 306010E
To mount the antenna do the following:
2. Put the loose flange
on top of the antenna
3. Tighten the flange to
the antenna by using
screws and nuts. Use
lubricating grease to
minimize friction
when the screws are
tightened.
Note! Tighten the screws carefully to a torque
according to the recommended values in
table 1.
Tighten opposite screws in pair.
Note! Use gaskets delivered by Saab. These gaskets are
optimized for use with microwave emitting equip-
ment. No other gaskets than Saab original may be
used for Process Seal antennas!
1. Place a gasket on top of the socket and mount
the antenna.
Use one of the two gaskets delivered by Saab:
• Teflon
or
• Graphite for temperatures above 250 º C.