Product Manual
Page of 7
4
3 Slide front leg assembly (part no.14)
into tray support, aligning holes in tool tray
(part no.3) with holes in front leg assembly.
Slide tray pin (part no. 11) through the
holes and fix with clip (part no. 12). As
shown in Fig 2.
4 Place base assembly (part no.1) upside
down on ground as shown in Fig 3 and
place legs into the holes with front leg
assembly (part no.14) toward jaws. Insert
leg bolts (part no.6), secure with nuts and
lock washers (part no. 7)
5 Turn the stand right side up and straighten
tool tray. Adjust and tighten the set screw
(part no. 13) at desired height. As shown in
Fig 4.
6 After finishing the assembly, place pipe into vise. Tighten the vise to hold the pipe in
place. Do not drop the pipe on the vise or use handle extensions when tightening the
vise, as this can damage the vise. Make sure the pipe and stand are stable for the
work to be done. For best stability during use, keep the pipe end as close to the vise
as possible. Use appropriate pipe supports if the pipe extends past the base of the
stand. Failure to properly support the pipe can cause chain breakage, vise tipping,
falling pipe and serious injury.
When using the vise, do not over reach and maintain proper footing and balance at all
times. This allows better control in unexpected situations.
Fig 2
Fig 3
Fig 4
Fig 3