81909 Issue 5 SUPER HOT TOASTER USERS (Pages 2-3)/ INSTALLATION (Pages 4-7) AND SERVICING INSTRUCTIONS THIS CAT I2H APPLIANCE IS FOR USE ON NATURAL GAS G20 AT A SUPPLY PRESSURE OF 20mbar IN GB and IE HAND THESE INSTRUCTIONS TO THE USER
'(6&5,37,21 The Super Hot Toaster has a single aerated burner, the design of which produces two parallel ribbons of flame which run across the front of the fire bed. The rear ribbon of flame is ignited first and the front ribbon cross-lights from it instantaneously. A single gas control selects ignition (pilot only) and can be turned anticlockwise to select a high rate and then a reduced input at the maximum rotation.
4. Depress the gas control slightly and turn clockwise until the indicator mark is opposite to the large flame symbol. The burner will now run at its maximum rate. 5. To turn the appliance ‘off’, return the control to the ‘off’ position. 6. If for any reason the fire cuts out, return the control knob to the `off’ position and wait 3 minutes before relighting.
,167$//$7,21 5(48,5(0(176 $1' 5(*8/$7,216 The appliance must be installed by a competent person in accordance with the current Gas Safety (Installation and Use) Regulations 1994 (as amended) or the rules in force and in accordance with the manufacturers instructions, failure to do so could lead to prosecution. The following are the relevant Codes of Practice and British Standards. The Building Regulations issued by the Department of the Environment.
&217(176 &+(&. /,67 (See figure 13 for identification) VENT BOX ASSEMBLY C/W: Burner assembly and Brass trim. 1 Simulated coal front L & R Hand coal support shelves 2 Burner inserts 12 Large, 5 Medium and 2 Triangular Coals. Fitting kit Installation & Users Instructions. ,167$//,1* 7+( $33/,$1&( If a fire back (chair brick) is fitted in the existing builders opening it will be necessary to remove it together with any infill or rubble.
),77,1* 7+( 9(17 %2;. Position the box in the centre of the opening with a sufficient gap between the front flanges and the surround to enable the tags on the rear of the brass trim to slide over. (Where a concealed gas supply is used feed the supply to the position of the burner connection). The box is secured in place with the two 10x11/4 round headed screws and plastic plugs supplied in the fitting kit using the two holes in the base of box.
2 /,*+7 7+( $33/,$1&( 1. Pull the adjustment lever out, this will reduce the warming up period. 2. Press and turn the gas control until the indicator mark is aligned with the IGN mark and keep the control fully depressed. 3. After a sufficient period has elapsed to allow the system to be purged of air, press and release the igniter button until a pilot flame has been established, (check that the pilot has lit on both the ports. Keep the control depressed for a further 20 seconds. 4.
0$,17(1$1&( $1' 6(59,&,1* GENERAL A. REMOVAL OF DEBRIS OR SOOT DEPOSITS; Allow the appliance to cool for one hour before removing all the coals and coal bed components for cleaning purposes. Once all the components have been removed from the fire bed check that no debris has become lodged in the burner ports (both front and rear). If any debris is present it may be easily removed with a thin piece of card or similar to ease out any foreign matter.
FIRE FRONTS & FRETS SUITABLE FOR THIS APPLIANCE. The illustration shown is the recommended MACH II Front and Fret, if an alternate Front and Fret is used, it is important to maintain the equivalent ventilation to that shown.
No Fig 6 issued with this document