Use Instructions
Table Of Contents
- Contents
- Document history overview
- Introduction
- Intended use RPI
- Installation procedures and requirements
- Principles of operation
- Performance characteristics and specifications
- Standard operation procedures
- Calibration procedures
- User interface and software menu
- Operational precautions, limitations and hazards
- Troubleshooting
- Maintenance
- Error list
- System temporarily out of use
- Decommissioning and disposal
- Glossary of Terms
- Index
Deep cleanse cycle
Yearly maintenance+ incidentally
Deep cleanse medium
Chloride cleaning tablet
Exterior sanitation
Common lab practice
Maintenance
Preventive maintenance calls
per year
1, by qualified field service engineer
Consumables replacement
frequency
RPI: Every 3 months, WPU: Every 3 months
Consumables
RPI-Check / Progard / Q-gard / end point filters / peristaltic
pump tubing and pickup tubes
Electrical requirements
Mains voltage
120 or 230V (± 10%), 50-60 Hz (± 3%)
Fuse EU (230V)
2x 3.15A T (Slow blow) Hollyland 31-50T-032H or equivalent
according IEC 60127 (250V, temp range -55°C to + 125°C)
Fuse USA (120V)
2x 6.3 A T (Slow blow)Hollyland 31-50T-063H or equivalent
according IEC 60127 (250V, temp range -55°C to + 125°C)
Power consumption
600 VA
Protection class
IP 20
Overvoltage category
II
Pollution degree
2
External connections
RS232 Serial connection
RJ11
Ethernet connection
TCP/IP
External light (24V)(option)
24V, < 2A
USB
2.0
Environment
Performance characteristics and specifications
18
MRN-184-EN Version 6 (05-01-2022)