Instruction manual

5 6 Ramp&Dwell5 6 Ramp & Dwell
Example 1: Temperature cycling ChamberExample 1: Temperature cycling Chamber
EIFN=SP.P2
A1FN=TIMR
OUT1=REVR, Relay Output
OUT2=COOL, 4-20mA Output
SPMD=MINR
IN1U= F
DP1=1-DP
EIFN=SP.P2
A1FN=TIMR
OUT1=REVR,
Relay Output
OUT2=COOL,
4-20mA Output
SPMD=MINR
IN1U=
F
DP1=1-DP
The circuit diagram and its temperature profile are shown below:The circuit diagram and its temperature profile are shown below:
A chamber is used to test the temperature cycling effect on personal
computers. An external cycle timer is used to control the event input for
switching the set point. The products under test are required to stay at 60 F
for 1 hour and -10 F for 30 minutes. The transition interval between high-low
temperature is required to be 5 minutes. Make the following setup:
A chamber is used to test the temperature cycling effect on personal
computers. An external cycle timer is used to control the event input for
switching the set point. The products under test are required to stay at 60 F
for 1 hour and -10 F for 30 minutes. The transition interval between high-low
temperature is required to be 5 minutes. Make the following setup:
Freezer
Heater
Inverter
ON
OFF
65
35
Cycle TimerCycle Timer
5V DC
Relay
5V DC
Relay
1
Mains
1
Mains
3AC3 AC
+
RTD
Chamber
TIME=60.0 (minutes )
SP1=60.0 F
SP2=-10.0 F
CPB=100 (%)
RAMP=14.0 ( F/minute )
TIME=60.0 (minutes )
SP1=60.0 F
SP2=-10.0 F
CPB=100
(%)
RAMP=14.0
( F/minute )
Figure 5.8Figure 5.8
A Temperature Cycling ChamberA Temperature Cycling Chamber
90
12
34
5
8910
11
67
12
13
14