Instructions / Assembly

OUTSIDE VIEW RIGHT SIDE
20
21
Close both doors. From inside the shed, install Screws (AA) 4 places connecting
Front Gable (U) to Left Front Panel (E) and Right Front Panel (F).
One person MUST hold onto the Front Gable (U) during this entire step. Set the Front Gable (U) onto the front wall panels.
Install Left Door Panel (G) by inserting the lower hinge pin into the hole in Front Floor (J). Lift the left end of the Front Gable (U) enough
to insert the top hinge pin on Left Door Panel (G) into the Front Gable (U) channel. Close Left Door Panel (G).
Install Right Door Panel (H) by inserting the lower hinge pin into the hole in Front Floor (J). Lift the right end of the Front Gable (U) enough
to insert the top hinge pin on Right Door Panel (H) into the Front Gable (U) channel. With Right Door Panel (H) open, install Bolt (DD) and Nut
(EE) connecting Right Front Panel (F) and Door Header (DH).
Open Left Door Panel (G). Close Right Door Panel (H). Install Bolt (DD) and Nut (EE) connecting Left Front Panel (E) and Door Header (DH).
Caution: When installing screws, do not overtighten.
Caution: Tighten nut securely but DO NOT compress the Front Panel.
DD
EE (2)
U
F
E
4
1
2
1
2
3
3
4
U
G
F
E
H
H
F
U
U
J
J
AA (4)
OUTSIDE VIEW LEFT SIDE
G
E
U